Well we've worked for 29 hours straight on the EDF Conference and Awards night and it was a great success.  We installed our Mobile club rig as a stage frame to save space in the cramped function suite, and the visuals system worked perfectly with a mix of graphics going out to the 3 projection screens (one was a double stacked 8klumen rear projection wall) and twelve 50" plasmas around the building.

Chris ran the sound desk, Jamie was on lighting, I did the presentation and production work and DJ Churchy was on the video console for the evening party.  A great time had by all.

 

edfedfedfedfedfedfedfedfedfedfedfedfedfedfedfedfedfedfedfedfedfedfedfedfedf